Why did the customer contact us?
The customer needed new attic insulation.
Solutions provided:
In first floor addition on right side of home cut an entry hike to gain access. After work is finished a attic entry point will be framed and entry door will be insulated. Weather stripping will be installed for better energy efficiency. An entry hole will be cut between the attic spaces to gain access to the other addition. Remove all batted fiberglass insulation from the one addition attic space. Install can light covers over recess light. Air seal any, crack, gap, and conduit line with spray foam for better energy efficiency. Install baffles around entry point and soffit lines for proper ventilation. Blow in new cellulose insulation to R49 (14 inches).